EDF Poland – the plant in Rybnik has been present on the outskirts of Rybnik, Silesia; since 1972. ERSA is one of the leading energy companies in Poland. The plant’s core business is electricity generation for the purposes of the National Power System. At present, the power plant in Rybnik has generation capacity of 1,775 MW and is the largest power plant in the Upper Silesia, in addition to being one of the largest power plants in the national power system in Poland. With the annual generation of over 9,000 GWh of electricity, the plant can meet approximately 8% of the demand of the National Power System (KSE). The power plant is a facility maintaining high uptime for generation and through high regulation abilities, achieving great efficiency in the reduction of emitted pollution.

Item
Value
Installed capacity
1 775 MW
Gross electricity generation 10 107 038,8 MWh
Unit running time 58 333,7 h
Availability rate
90,1 %
Failure frequency rate
1,4 %
Ash and slag recovery factor 100%
  • EDF Poland - the plant in Rybnik
  • EDF Poland - the plant in Rybnik
  • EDF Poland - the plant in Rybnik
  • EDF Poland - the plant in Rybnik
  • EDF Poland - the plant in Rybnik